Before AVEN, our founder spent nine years engineering some of Southern Africa’s heaviest and most complex project moves. That discipline shapes how we develop property today.
2006 – 2015 · ALE Heavylift South Africa
Abnormal loads, engineered.
From November 2006 to October 2015, our founder was actively involved in ALE Heavylift South Africa, the abnormal load engineering business that moved, lifted and installed components at Eskom power stations, South Africa’s major ports, steel plants, mines and some of South Africa’s first utility-scale renewable energy projects.
ALE South Africa was run from Firgrove Business Park, the same park AVEN went on to develop and where our offices are today.
1 000 t
Heaviest single pieces: LPG vessels, Mauritius
12
~360 t stator generators for Medupi & Kusile
37
Wind turbines installed at Hopefield
220 m
Komati chimney flue installation
7
Countries: SA, Namibia, Botswana, Zambia, Eswatini, Tanzania, Mauritius
Selected Projects
ALE job record
Project sheets from ALE Heavylift South Africa, 2007 – 2013.
ALE SA 07-033
2007
Komati chimney flue installation
Komati Power Station, Mpumalanga
2 × 440 t
Engineered and installed two flue liners, 72 flue cans in total, inside a 220 m concrete chimney using strand jacks on the 151 m platform. A first of its kind in South Africa.
ALE SA F8430
-
Blast Furnace D installation
ArcelorMittal, Vanderbijlpark
5 sections · 2 800 t
Transported five furnace sections of 380–640 t by self-propelled trailer, lifted them with strand jacks, skidded them into the cast house and stacked them to a final height of 42 m.
ALE SA G710
2008
Open cycle gas turbine power stations
Atlantis & Mossel Bay, Western Cape
42 loads · 187–230 t
Transported and installed turbines, generators and transformers for two OCGT projects from Cape Town and Mossel Bay harbours, using a 280 t gantry, skidding and jacking.
ALE SA 08-065
2008
ASD 3211 tug transport
Cape Town harbour
460 t
Loaded, moved and offloaded a 32.5 m tug over a 3.2 km route to the synchrolift: one of the largest loads moved in the Cape Town region.
ALE SA 08-081
2008
Stator generator handling & installation
Medupi & Kusile Power Stations
12 × ~360 t
Loading, transport, offloading and installation in the turbine halls, using a 400 t gantry system ALE designed and built for the contract.
ALE SA 09-025
2009
Stator generator offloading
Medupi Power Station, Lephalale
12 × ~357 t
Offloading six stator generators each for Medupi and Kusile with the AL500 beam trailer and Megalift system into storage cradles.
ALE SA 09-088
2009
Tug T310 launch
Port of Durban
750 t
Jacked, transported and set down a 750 t tug onto a submersible dock in a roll-on operation lasting several hours.
ALE SA 10-105
2010
Transformer transport, Unit 5
Richards Bay to Matimba, Lephalale
345.8 t
Cross-country transport of a Medupi transformer via Swaziland on the AL500 girder-frame trailer for interim storage at Matimba.
ALE SA 10-248
2010
ALE SA 10-248
Port of Cape Town
2 × 75 t, 1 × 33 t
Transported three crew boats by self-propelled trailer, staging two and launching the third directly from the trailer with a floating crane.
ALE SA 10-315
2010
Stator generator warehousing
Richards Bay
2 × 357 t
Received, transported, staged and warehoused stators for Medupi and Kusile, securing route and bridge clearances to move them 10 km over a weekend.
ALE SA RCB
-
Richards Bay heavy cargo facility
Richards Bay, KwaZulu-Natal
Pieces up to 500 t
Established an undercover storage and handling facility with an open staging area, letting clients hand over project logistics.
ALE SA 11-338
2011
KECL gas turbine project
Kilwa Masoko, Tanzania
301 pieces · 45–206 t
Turnkey discharge of a full project vessel: transhipment to barges, beach landing at a prepared site and transport to the laydown area.
ALE SA 11-504
2011
Hammanskraal storage facility
Hammanskraal, Gauteng
25 500 m² warehouse
Established a warehouse, offices and handling facility for project commodities in Gauteng.
ALE SA 12-031
2012
Hopefield Wind Farm
Saldanha Bay to Hopefield, Western Cape
37 turbines
Port operations, transport, mechanical erection and installation of 37 wind turbine generators, each with ten main components of up to 80 t.
ALE SA 12-061
2012
Skidding two container cranes
Port of Ngqura
2 × 993 t
Jacked and skidded two ship-to-shore cranes about 200 m onto their rails with a purpose-built skid track and frame.
ALE SA 12-063
2012
Generator sets to Ndola, Zambia
Richards Bay to Ndola
6 × 130 t
Received, staged and hauled six generator sets by road through South Africa, Botswana and Namibia to northern Zambia.
ALE SA 12-096
2012
LPG tank farm vessels
Port Louis, Mauritius
3 × 1 000 t
Rolled off three 1 000 t LPG vessels from a project ship, transported them on SPMTs and installed them with skid shoes and integrated jacking.
ALE SA 12-230
2012
Deep-sea crawler exchange
Cape Town dry dock
2 × 280 t
Designed a gantry with strand-jack lifting and skidding to exchange deep-sea crawlers without a conventional heavy-lift crane.
ALE SA 13-177
2013
KaXu Solar One heat exchangers
Lüderitz to Upington
2 × 335 t
Received two heat exchangers at Lüderitz, Namibia, transported them to the KaXu solar plant and installed them with a four-post lifting system.
ALE SA 07-033
2007
Komati chimney flue installation
Komati Power Station, Mpumalanga
2 × 440 t
Engineered and installed two flue liners, 72 flue cans in total, inside a 220 m concrete chimney using strand jacks on the 151 m platform. A first of its kind in South Africa.
ALE SA G710
2008
Open cycle gas turbine power stations
Atlantis & Mossel Bay, Western Cape
42 loads · 187–230 t
Transported and installed turbines, generators and transformers for two OCGT projects from Cape Town and Mossel Bay harbours, using a 280 t gantry, skidding and jacking.
ALE SA 08-081
2008
Stator generator handling & installation
Medupi & Kusile Power Stations
12 × ~360 t
Loading, transport, offloading and installation in the turbine halls, using a 400 t gantry system ALE designed and built for the contract.
ALE SA 09-025
2009
Stator generator offloading
Medupi Power Station, Lephalale
12 × ~357 t
Offloading six stator generators each for Medupi and Kusile with the AL500 beam trailer and Megalift system into storage cradles.
ALE SA 10-105
2010
Transformer transport, Unit 5
Richards Bay to Matimba, Lephalale
345.8 t
Cross-country transport of a Medupi transformer via Swaziland on the AL500 girder-frame trailer for interim storage at Matimba.
ALE SA 11-338
2011
KECL gas turbine project
Kilwa Masoko, Tanzania
301 pieces · 45–206 t
Turnkey discharge of a full project vessel: transhipment to barges, beach landing at a prepared site and transport to the laydown area.
ALE SA 12-031
2012
Hopefield Wind Farm
Saldanha Bay to Hopefield, Western Cape
37 turbines
Port operations, transport, mechanical erection and installation of 37 wind turbine generators, each with ten main components of up to 80 t.
ALE SA 12-063
2012
Generator sets to Ndola, Zambia
Richards Bay to Ndola
6 × 130 t
Received, staged and hauled six generator sets by road through South Africa, Botswana and Namibia to northern Zambia.
ALE SA 13-177
2013
KaXu Solar One heat exchangers
Lüderitz to Upington
2 × 335 t
Received two heat exchangers at Lüderitz, Namibia, transported them to the KaXu solar plant and installed them with a four-post lifting system.
ALE SA 08-065
2008
ASD 3211 tug transport
Cape Town harbour
460 t
Loaded, moved and offloaded a 32.5 m tug over a 3.2 km route to the synchrolift: one of the largest loads moved in the Cape Town region.
ALE SA 09-088
2009
Tug T310 launch
Port of Durban
750 t
Jacked, transported and set down a 750 t tug onto a submersible dock in a roll-on operation lasting several hours.
ALE SA 10-248
2010
Launching three crew boats
Port of Cape Town
2 × 75 t, 1 × 33 t
Transported three crew boats by self-propelled trailer, staging two and launching the third directly from the trailer with a floating crane.
ALE SA 12-061
2012
Skidding two container cranes
Port of Ngqura
2 × 993 t
Jacked and skidded two ship-to-shore cranes about 200 m onto their rails with a purpose-built skid track and frame.
ALE SA 12-230
2012
Deep-sea crawler exchange
Cape Town dry dock
2 × 280 t
Designed a gantry with strand-jack lifting and skidding to exchange deep-sea crawlers without a conventional heavy-lift crane.
ALE SA F8430
-
Blast Furnace D installation
ArcelorMittal, Vanderbijlpark
5 sections · 2 800 t
Transported five furnace sections of 380–640 t by self-propelled trailer, lifted them with strand jacks, skidded them into the cast house and stacked them to a final height of 42 m.
ALE SA 12-096
2012
LPG tank farm vessels
Port Louis, Mauritius
3 × 1 000 t
Rolled off three 1 000 t LPG vessels from a project ship, transported them on SPMTs and installed them with skid shoes and integrated jacking.
ALE SA 10-315
2010
Stator generator warehousing
Richards Bay
2 × 357 t
Received, transported, staged and warehoused stators for Medupi and Kusile, securing route and bridge clearances to move them 10 km over a weekend.
ALE SA RCB
-
Richards Bay heavy cargo facility
Richards Bay, KwaZulu-Natal
Pieces up to 500 t
Established an undercover storage and handling facility with an open staging area, letting clients hand over project logistics.
ALE SA 11-504
2011
Hammanskraal storage facility
Hammanskraal, Gauteng
25 500 m² warehouse
Established a warehouse, offices and handling facility for project commodities in Gauteng.
What heavy lifting taught us
Engineering discipline, applied to property.
Plan the route before you move.
Every abnormal load starts with route surveys, clearances and contingencies. Every AVEN project starts with feasibility, rights and approvals.
Infrastructure decides what is possible.
Ports, roads, bridges and bulk services set the limits. We test bulk capacity before we buy land.
No incidents, no lost time.
Safety and programme discipline on 1 000 t lifts carry straight into construction management.
Logistics property was the bridge.
Building ALE’s Richards Bay and Hammanskraal facilities was early industrial property work, and it led to Firgrove.
Long relationships.
Power, port, steel, mining and renewable-energy clients over nearly a decade.
Timeline
2006 to today
From abnormal loads to business parks, retail and residential precincts.
Heavy lifting begins
Founder joins ALE Heavylift South Africa, run from Firgrove Business Park.
Komati Power Station
First-of-its-kind chimney flue installation inside a 220 m stack.
Gas turbines & Medupi
OCGT power stations in Atlantis and Mossel Bay; stator contracts for Medupi and Kusile.
Firgrove Business Park
Development of the 21 000 m² park begins.
Logistics property
Heavy cargo facility at Richards Bay and a 25 500 m² warehouse at Hammanskraal.
Hopefield Wind Farm
37 wind turbines delivered and installed in the Western Cape.
KaXu Solar One
Heat exchangers installed at the Upington solar plant.
AVEN’s group founded
The founder leaves ALE in October to focus on property development.
Shofar Church
Construction starts; the project is ongoing.
Firgrove complete
Firgrove Business Park completed after 15 years.
Riverside & Wingrove
NewSpace Systems moves into Building B in February. At Wingrove, the main contractor is on site and columns are up for Brights Hardware and Spar.