History

Built on heavy lifting.

Before AVEN, our founder spent nine years engineering some of Southern Africa’s heaviest and most complex project moves. That discipline shapes how we develop property today.

2006 – 2015 · ALE Heavylift South Africa

Abnormal loads, engineered.

From November 2006 to October 2015, our founder was actively involved in ALE Heavylift South Africa, the abnormal load engineering business that moved, lifted and installed components at Eskom power stations, South Africa’s major ports, steel plants, mines and some of South Africa’s first utility-scale renewable energy projects.

ALE South Africa was run from Firgrove Business Park, the same park AVEN went on to develop and where our offices are today.

1 000 t

Heaviest single pieces: LPG vessels, Mauritius

12

~360 t stator generators for Medupi & Kusile

37

Wind turbines installed at Hopefield

220 m

Komati chimney flue installation

7

Countries: SA, Namibia, Botswana, Zambia, Eswatini, Tanzania, Mauritius

Selected Projects

ALE job record

Project sheets from ALE Heavylift South Africa, 2007 – 2013.

ALE SA 07-033

2007

Komati chimney flue installation

Komati Power Station, Mpumalanga

2 × 440 t

Engineered and installed two flue liners, 72 flue cans in total, inside a 220 m concrete chimney using strand jacks on the 151 m platform. A first of its kind in South Africa.

ALE SA F8430

-

Blast Furnace D installation

ArcelorMittal, Vanderbijlpark

5 sections · 2 800 t

Transported five furnace sections of 380–640 t by self-propelled trailer, lifted them with strand jacks, skidded them into the cast house and stacked them to a final height of 42 m.

ALE SA G710

2008

Open cycle gas turbine power stations

Atlantis & Mossel Bay, Western Cape

42 loads · 187–230 t

Transported and installed turbines, generators and transformers for two OCGT projects from Cape Town and Mossel Bay harbours, using a 280 t gantry, skidding and jacking.

ALE SA 08-065

2008

ASD 3211 tug transport

Cape Town harbour

460 t

Loaded, moved and offloaded a 32.5 m tug over a 3.2 km route to the synchrolift: one of the largest loads moved in the Cape Town region.

ALE SA 08-081

2008

Stator generator handling & installation

Medupi & Kusile Power Stations

12 × ~360 t

Loading, transport, offloading and installation in the turbine halls, using a 400 t gantry system ALE designed and built for the contract.

ALE SA 09-025

2009

Stator generator offloading

Medupi Power Station, Lephalale

12 × ~357 t

Offloading six stator generators each for Medupi and Kusile with the AL500 beam trailer and Megalift system into storage cradles.

ALE SA 09-088

2009

Tug T310 launch

Port of Durban

750 t

Jacked, transported and set down a 750 t tug onto a submersible dock in a roll-on operation lasting several hours.

ALE SA 10-105

2010

Transformer transport, Unit 5

Richards Bay to Matimba, Lephalale

345.8 t

Cross-country transport of a Medupi transformer via Swaziland on the AL500 girder-frame trailer for interim storage at Matimba.

ALE SA 10-248

2010

ALE SA 10-248

Port of Cape Town

2 × 75 t, 1 × 33 t

Transported three crew boats by self-propelled trailer, staging two and launching the third directly from the trailer with a floating crane.

ALE SA 10-315

2010

Stator generator warehousing

Richards Bay

2 × 357 t

Received, transported, staged and warehoused stators for Medupi and Kusile, securing route and bridge clearances to move them 10 km over a weekend.

ALE SA RCB

-

Richards Bay heavy cargo facility

Richards Bay, KwaZulu-Natal

Pieces up to 500 t

Established an undercover storage and handling facility with an open staging area, letting clients hand over project logistics.

ALE SA 11-338

2011

KECL gas turbine project

Kilwa Masoko, Tanzania

301 pieces · 45–206 t

Turnkey discharge of a full project vessel: transhipment to barges, beach landing at a prepared site and transport to the laydown area.

ALE SA 11-504

2011

Hammanskraal storage facility

Hammanskraal, Gauteng

25 500 m² warehouse

Established a warehouse, offices and handling facility for project commodities in Gauteng.

ALE SA 12-031

2012

Hopefield Wind Farm

Saldanha Bay to Hopefield, Western Cape

37 turbines

Port operations, transport, mechanical erection and installation of 37 wind turbine generators, each with ten main components of up to 80 t.

ALE SA 12-061

2012

Skidding two container cranes

Port of Ngqura

2 × 993 t

Jacked and skidded two ship-to-shore cranes about 200 m onto their rails with a purpose-built skid track and frame.

ALE SA 12-063

2012

Generator sets to Ndola, Zambia

Richards Bay to Ndola

6 × 130 t

Received, staged and hauled six generator sets by road through South Africa, Botswana and Namibia to northern Zambia.

ALE SA 12-096

2012

LPG tank farm vessels

Port Louis, Mauritius

3 × 1 000 t

Rolled off three 1 000 t LPG vessels from a project ship, transported them on SPMTs and installed them with skid shoes and integrated jacking.

ALE SA 12-230

2012

Deep-sea crawler exchange

Cape Town dry dock

2 × 280 t

Designed a gantry with strand-jack lifting and skidding to exchange deep-sea crawlers without a conventional heavy-lift crane.

ALE SA 13-177

2013

KaXu Solar One heat exchangers

Lüderitz to Upington

2 × 335 t

Received two heat exchangers at Lüderitz, Namibia, transported them to the KaXu solar plant and installed them with a four-post lifting system.

ALE SA 07-033

2007

Komati chimney flue installation

Komati Power Station, Mpumalanga

2 × 440 t

Engineered and installed two flue liners, 72 flue cans in total, inside a 220 m concrete chimney using strand jacks on the 151 m platform. A first of its kind in South Africa.

ALE SA G710

2008

Open cycle gas turbine power stations

Atlantis & Mossel Bay, Western Cape

42 loads · 187–230 t

Transported and installed turbines, generators and transformers for two OCGT projects from Cape Town and Mossel Bay harbours, using a 280 t gantry, skidding and jacking.

ALE SA 08-081

2008

Stator generator handling & installation

Medupi & Kusile Power Stations

12 × ~360 t

Loading, transport, offloading and installation in the turbine halls, using a 400 t gantry system ALE designed and built for the contract.

ALE SA 09-025

2009

Stator generator offloading

Medupi Power Station, Lephalale

12 × ~357 t

Offloading six stator generators each for Medupi and Kusile with the AL500 beam trailer and Megalift system into storage cradles.

ALE SA 10-105

2010

Transformer transport, Unit 5

Richards Bay to Matimba, Lephalale

345.8 t

Cross-country transport of a Medupi transformer via Swaziland on the AL500 girder-frame trailer for interim storage at Matimba.

ALE SA 11-338

2011

KECL gas turbine project

Kilwa Masoko, Tanzania

301 pieces · 45–206 t

Turnkey discharge of a full project vessel: transhipment to barges, beach landing at a prepared site and transport to the laydown area.

ALE SA 12-031

2012

Hopefield Wind Farm

Saldanha Bay to Hopefield, Western Cape

37 turbines

Port operations, transport, mechanical erection and installation of 37 wind turbine generators, each with ten main components of up to 80 t.

ALE SA 12-063

2012

Generator sets to Ndola, Zambia

Richards Bay to Ndola

6 × 130 t

Received, staged and hauled six generator sets by road through South Africa, Botswana and Namibia to northern Zambia.

ALE SA 13-177

2013

KaXu Solar One heat exchangers

Lüderitz to Upington

2 × 335 t

Received two heat exchangers at Lüderitz, Namibia, transported them to the KaXu solar plant and installed them with a four-post lifting system.

ALE SA 08-065

2008

ASD 3211 tug transport

Cape Town harbour

460 t

Loaded, moved and offloaded a 32.5 m tug over a 3.2 km route to the synchrolift: one of the largest loads moved in the Cape Town region.

ALE SA 09-088

2009

Tug T310 launch

Port of Durban

750 t

Jacked, transported and set down a 750 t tug onto a submersible dock in a roll-on operation lasting several hours.

ALE SA 10-248

2010

Launching three crew boats

Port of Cape Town

2 × 75 t, 1 × 33 t

Transported three crew boats by self-propelled trailer, staging two and launching the third directly from the trailer with a floating crane.

ALE SA 12-061

2012

Skidding two container cranes

Port of Ngqura

2 × 993 t

Jacked and skidded two ship-to-shore cranes about 200 m onto their rails with a purpose-built skid track and frame.

ALE SA 12-230

2012

Deep-sea crawler exchange

Cape Town dry dock

2 × 280 t

Designed a gantry with strand-jack lifting and skidding to exchange deep-sea crawlers without a conventional heavy-lift crane.

ALE SA F8430

-

Blast Furnace D installation

ArcelorMittal, Vanderbijlpark

5 sections · 2 800 t

Transported five furnace sections of 380–640 t by self-propelled trailer, lifted them with strand jacks, skidded them into the cast house and stacked them to a final height of 42 m.

ALE SA 12-096

2012

LPG tank farm vessels

Port Louis, Mauritius

3 × 1 000 t

Rolled off three 1 000 t LPG vessels from a project ship, transported them on SPMTs and installed them with skid shoes and integrated jacking.

ALE SA 10-315

2010

Stator generator warehousing

Richards Bay

2 × 357 t

Received, transported, staged and warehoused stators for Medupi and Kusile, securing route and bridge clearances to move them 10 km over a weekend.

ALE SA RCB

-

Richards Bay heavy cargo facility

Richards Bay, KwaZulu-Natal

Pieces up to 500 t

Established an undercover storage and handling facility with an open staging area, letting clients hand over project logistics.

ALE SA 11-504

2011

Hammanskraal storage facility

Hammanskraal, Gauteng

25 500 m² warehouse

Established a warehouse, offices and handling facility for project commodities in Gauteng.

What heavy lifting taught us

Engineering discipline, applied to property.

Plan the route before you move.

Every abnormal load starts with route surveys, clearances and contingencies. Every AVEN project starts with feasibility, rights and approvals.

Infrastructure decides what is possible.

Ports, roads, bridges and bulk services set the limits. We test bulk capacity before we buy land.

No incidents, no lost time.

Safety and programme discipline on 1 000 t lifts carry straight into construction management.

Logistics property was the bridge.

Building ALE’s Richards Bay and Hammanskraal facilities was early industrial property work, and it led to Firgrove.

Long relationships.

Power, port, steel, mining and renewable-energy clients over nearly a decade.

Timeline

2006 to today

From abnormal loads to business parks, retail and residential precincts.

2006

Heavy lifting begins

Founder joins ALE Heavylift South Africa, run from Firgrove Business Park.

2007

Komati Power Station

First-of-its-kind chimney flue installation inside a 220 m stack.

2008

Gas turbines & Medupi

OCGT power stations in Atlantis and Mossel Bay; stator contracts for Medupi and Kusile.

2009

Firgrove Business Park

Development of the 21 000 m² park begins.

2011

Logistics property

Heavy cargo facility at Richards Bay and a 25 500 m² warehouse at Hammanskraal.

2012

Hopefield Wind Farm

37 wind turbines delivered and installed in the Western Cape.

2013

KaXu Solar One

Heat exchangers installed at the Upington solar plant.

2015

AVEN’s group founded

The founder leaves ALE in October to focus on property development.

2020

Shofar Church

Construction starts; the project is ongoing.

2024

Firgrove complete

Firgrove Business Park completed after 15 years.

2026

Riverside & Wingrove

NewSpace Systems moves into Building B in February. At Wingrove, the main contractor is on site and columns are up for Brights Hardware and Spar.

Work with Aven